Ehab magdy Abass
Civil Engineer as Technical Office
- Name :Ehab Magdy
- e: eh.m.a@hotmail.com
- w: ihab-magdy.blogspot.com
- m: 01116030797
- Hard copy: CV Arabic
- Hard copy: CV English
I'm a Qs - Shop drawing with over 5 years commercial experience
I Hope to work in mega Construction project
Contact Details :
Address: Egypt. Cairo .New MAADI
PHONE:252-00-692
: 01116030797
E-Mail : EH.M.A@hotmail.com
Personal Details:
Date of birth 30/9/1992
Gender Male
Marital Status Single
Nationality Egyptian
Military Duty Done 1/9/2016
Religion Muslim
Degree BSc . Civil Engineer
Graduate 2014
Language:
Arabic Native
English (good)Read,Write&Speak
Skills:
Technical Office
-BOQ
-Shop drawing
-Contractor. Offers
-Schedule (Excel)
Courses:
-Site Training 2011
-Site Training 2013
- Autocad 2013
- Sap2000 2017
-Revit Str 2019
-Adv. Technical office 2020
Begnieer:
-Cost Control/Tendering
Free Nature For industrial investment :
From 1-3-2023 to Now
Technical Office.
construct El anaber ,Buildings of Services in General Layout…
Complate working of Elwaad Elsadq Group which was Steel Works , usual works ,Machines and Electric works including Steel Stairs works Coving celling From I-beam section Main & Branches ,heavy steel Doors, Windows and each covering Voids Vertical or horizontal on El anaber Building From Steel Section my Work was QS Steel ,working draws ,Invoices for Owner and Contractors, Revision Full QS of Project starting for Clauses that ended to ending project, every building has Bill of Quantity as alone ,and Amount of Purchase orders ,Making Full Report About Status of site
Elwaad Elsadq Group:
From 1-2-2021 To 1-3-2023
Technical Office.
Floor(distrib./Electric/Mosque/Kitchen/Boiler/Tank/…) Twice Floor(Education build , Taring, Visiting building, lift station ,solar tank)
Construct building from giving Surveyors Points to locate build until Finishing levels also Revision Drawings Arch with Structure and evaporate conflicts ,Making Shop drawings for concrete formwork, steel singularity and cutting optimization for steel bars with QS, Revision Leveling with Consultants from located buildings, Excavation to Finishing , I made also coordination with all infrastructure network, Machines and Electricity with QS ,Network of cold water, hot , return ,Drainage slope, Fire Fighting, High current cable, low current cable , network of lighting…….etc. from building to source using AutoCAD ,updating General layout relocate water Tank Location and locate distribution, drainage riser Network leveling ,solar tanks, surveillance towers Drawing of Roads around project as consultants requires, Also QS concrete of all project to estimate for Ready fresh concrete from company station- QS ,Road Qs Base , sub base , Rc , Asphalt ……..),additionally making invoices of contractors in main building of company + Owner invoices I mean invoices of company
Building of Four Floors (Elaanaabr (4)) & Discipline twice floor
Constrict building from giving Surveyors Points to locate buildings Skeleton from concrete ,to finishing ,i redirection of Drawings to be like as designer planning in layout which each twice of four building mirror to other so i made full copy from all drawing (Arch, Stru, Elec, Mec) to El anaber
surveillance towers and protection elements (Walls &towers &multi tower…)
Skeleton Done Concreate Walls and Protection towers in Walls starting from Giving Surveyor Levels of Walls and points to locate much more 800 meter length and points locate towers expansion and subsidence joints I made every thing Starting from locate Walls point to Finishing …ect also Qs ,contractor invoices ….
House Of Building And Construction
From 1-4-2019 To 30-9-2020
Technical Office.
Azaher Storage Project
In The beginning of my Work in Company my Task is Revision of BOQ Of building to check what difference between paid and get from last operation and I found reasons ,there some item inserted in works and didn’t attachments to paper
Arch. Building Ain shams university
Creating Drawing Before work in unusually changes Making As Built
Getting Actual Dim and Creating Plan Of Rooms then Starting BOQ Of Building
Section and Elevation and I faced new Material Of Finishing
Concrete. Building Ain Shams university
Getting Actual Dim and Creating Plan Of Rooms then Starting BOQ Of Building
Section and Elevation
Club House in Up vile (6th Of October)
Begin this project From A to Z set Points of Excavation,Backfill, cut fill ,Concrete
Buildings , Strip isolation ……ect
Electricity Building In Upvile (6th Of October)
The Owner Finding that operation so fast on Club has and is huge building and Complex and contractor So later on this building so they are gave it to company
.Just Concrete ,Backfill and building cut fill my Tasks Shop drawing and BOQ
Management Building In Upvile (6th Of October)
The Owner Finding that operation so fast on Club and it is huge building and Complex and contractor So late on this building so they are gave it to company
.I Worked to contentious from Last ,Building and Concrete of roof ……ect
.
The Nursery Building In Upvile (6th Of October )
The Owner Finding that operation so fast on Club and it is huge building and Complex and contractor So late on this building so they are gave it to company
.I Worked to contentious from Last ,Building and finishing ……ect
Civil Engineering and Development BSc(Honours)
I graduated from New Cairo Academy in 2014 in public Feild